Skip to content

Footpath Repairs – Wootton Drive

YAY!!!! Wootton Drive paths are about to get a little TLC! 🙂

That PERMIT NUMBER by the way, is BR6401000 259541. Works start 28th February and continue 'till 1st May.


UPDATE - 8th March 2022

After checking the HCC website, residents were concerned that only one side of Wootton Drive was going to be resurfaced... the side that to them, didn't really need doing!

After a couple of weeks, the first part looks done and it's on the other side!!! Repairs/ resurfacing however, appear to be taking place on both sides of the road.

The first bit of resurfacing Wootton Drive, looks pretty much done.
And preparations begin to start the other side. GREAT!!!!